
Le Temple
Pix's first project, delivered in under three months, in La Rochelle
- Location
- La Rochelle
- Floor area
- 600 sqm
- Year
- 2023
Expertise
Write the venue's story before building it. World, story, game sequence and mechanism drawings, in a document a set builder and a developer can execute.
Who it is for Operators with a space and no story, or a story that does not hold
Deliverable
World bible, detailed story, game sequence, mechanism drawings, player-facing copy
Duration
3 to 6 weeks per room
Fees
From 5,900 € excl. VAT
A venue without a story is recognisable immediately. The set is handsome and the experience is flat, because nothing tells the player why they are there or what is at stake.
The other mistake, and the costlier one, is writing the story after the drawings. You then spend your time justifying a door that already existed, and the narrative chases the architecture instead of commanding it.
A framing workshop with you, to settle the register and the operating constraints. A first version of the world, discussed. Then detailed writing, room by room, with two sign-off points.
A story is also judged on what it costs to run: reset time between two games, how many staff are needed in the room, foreseeable breakage. We write with those three figures in view.

Pix's first project, delivered in under three months, in La Rochelle
Our team is here to answer your questions and look at your project. We reply within two working days.