What can you do with a 300 sqm unit?

This is the size where two opposite models both work: a single activity, or five overlapping activities around a bar. We have delivered both.

Updated 9/25/2026

The short answer

300 sqm is the first size at which a leisure centre becomes possible, on one condition: that functions overlap. Otherwise the same area comfortably holds a single activity, done better.

Two delivered projects, two opposite models

Mythologique, Montpellier: 250 sqm, one escape game. The whole area works for a single activity. Reception, waiting and briefing serve one flow, and the sets receive the budget that would otherwise have been spread thin.

Otopia, Angoulême: 300 sqm, five activities. Escape game, karaoke, quiz, bar and food coexist. Fifty square metres more, four activities more. Floor area is not what made that possible, the layout is: the bar is simultaneously the reception, the waiting area, the place people spend money and the supervision point.

An identical unit would have produced a mediocre result with a reception, a corridor and five separate rooms. The number of activities that fits into 300 sqm is a consequence of the layout, not a property of the unit.

How to choose between them

The question is not how many activities you can fit. It is:

  • Do you want to run a bar? A bar changes the trade, the opening hours, the licence, the staffing and how long customers stay. Without a bar, functions cannot overlap and the five-activity model collapses.
  • Will your catchment area come back? A single activity lives on a renewed audience. A multi-activity venue lives on the same customers returning for something else.
  • How many people on the floor? Five activities in 300 sqm need a team able to run the bar and launch games, not one person at a desk.

What to check at this size

  • The shape of the unit before its area. 300 sqm in a long, narrow shape with a single entrance rules out overlap: everything becomes corridor.
  • The number of fire exits as soon as the permitted occupancy rises.
  • Toilets, in number and accessibility, which change with occupancy and with the presence of food service.
  • Extraction, if a kitchen, even a small one, enters the project.

Next step

This size band is decided on the layout, not on the unit. That is exactly what 2D drawings and positioning settle.

Is this your question?

Three questions and we assemble a page with comparable venues, the activities that fit your floor area and the steps to plan for.